Why load is removed in the process of strengthening?

In order to make the new and old structure to bear force together, should first remove the original structure load before the reinforcement. It is a better way to reapply it after reinforcement.

structural reinforcement carbon fiber


There is a general problem of structural reinforcement: the stress of the newly added part will lag slightly. In order to make the new and old structure to bear force together, should first remove the original structure load before the reinforcement. It is a better way to reapply it after reinforcement.


How do you remove the load?

1.Complete and accurate unloading can be used reverse loading unloading jack; 

2.Simple unloading can be removed only live load, and avoid the construction load.


Productos recomendados de Horse constuction

Puede encontrar cualquier cosa que necesite, confíe en probar estos productos y encontrará la gran diferencia después de eso.

HM-20 FIBRA DE CARBONO | REFORZAMIENTO ESTRUCTURAL

Tejido de fibra de carbono unidireccional de alta resistencia para refuerzo de compuesto de polímero reforzado con fibra (FRP).

Ver más >

HM-1.2T LAMINADOS FIBRA CARBONO | REFUERZO ESTRUCTURAL

Lámina de fibra de carbono pultruída para reforzamiento de estructuras

Ver más >

HM PLACA CFRP PRETENSADA

Placa / laminado / banda de polímero pretensado reforzado con fibra de carbono (CFRP) para la losa, refuerzo del haz

Ver más >

Back
Top
Close