Shanghai Dongyuan Baoshan Warehouse
load increase
Shanghai Dongyuan Enterprise Development Co., Ltd. Baoshan warehouse retrofitting project, due to load increased, it is necessary to reinforce and repair.Choose HM-23 carbon fiber cloth and HM-180C3P carbon fiber adheisve for strengthening
Project overview
Shanghai Dongyuan Enterprise Development Co., Ltd. Baoshan warehouse retrofitting project, due to load increased, it is necessary to reinforce and repair.
Construction site
Baoshan District, Yun Yun Road No. 393
Project category
Civil building engineering
Reinforcement time
August 2013
Specific description:
(1) The floors: 11 layers
(2) Height: 47.4m
(3) Construction area: 60809m2
Reinforcement method
Structural strengthening materials
HM-23 carbon fiber cloth and HM-180C3P carbon fiber adheisve