Beam strengthening
Section-enlarging reinforcing method
Due to the change of the function of the workshop, after the original decoration is removed, the strength of the beam is checked and the beam bottom is strengthened by cross section with injectable anchoring .
Project Name: strengthening project of Shifang powerhouse
Project site: Shifang, Deyang
Project scale: the number of building floors is two floors on the ground and three parts locally. Due to the change of the function of the workshop, after the original decoration is removed, the strength of the beam is checked and the beam bottom is strengthened by cross section with injectable anchoring .