Zhejiang Film and Television Production Center Phase I Building

reinforcement with HM carbon fiber fabric

carbon fiber strengthening system,CFRP.jpg

Project Overview

Zhejiang Film and Television Production Center, a film and television post-production complex project, due to change the structure of the use of the system, increase the load, is now reinforced.


Reinforcement time

February 2015


Reinforcement method

Carbon fiber cloth reinforcement,carbon fiber strnegthening system


Material selection

HM carbon fiber cloth and epoxy adhesive for carbon fiber

carbon fiber

carbon fiber strengthening live pic

carbon fiber strnengthing.jpg





Los productos utilizados en este proyectoLas personas que consultaron este proyecto también interesa a estos productos:

Back
Top
Close