Due to the completion of the main structure, the beam and slab structure needs to be reliably connected with the original main structure because the original main structure is not reserved for reinforcement. In order to guarantee the quality of construction, structural reinforcement rebar is now carried out.
Due to the completion of the main structure, the beam and slab structure needs to be reliably connected with the original main structure because the original main structure is not reserved for reinforcement. In order to guarantee the quality of construction, structural reinforcement rebar is now carried out.
Three grade reinforcement is used in this project. The depth of planting bar is designed as plate 25D and beam column 30D.
A grade anchoring adhesive: HM-500 injectable anchor adhesive.