Bond steel reinforcement at the new opening

Due to the local changes of the construction drawings, the dark column area in the part of the shear wall in the new open hole area needs to increase the shear wall and choose the steel plate reinforcement.

Bond steel reinforcement at the new opening


Project overview

The construction of residential building works in May 2010. Due to the local changes of the construction drawings, the dark column area in the part of the shear wall in the new open hole area needs to increase the shear wall and choose the steel plate reinforcement.


Bond steel reinforcement at the new opening

Epoxy bonded steel plate strengthening

1.drilling hole
2.preparing the surface
3.installing the steel frame
4.sealing and setting gas vent
5.mixing and injecting the adhesive
6.curing and maintenance
7.examination
8.applying anti-corrosion measures


Los productos utilizados en este proyectoLas personas que consultaron este proyecto también interesa a estos productos:

Back
Top
Close