Post installed rebar connections
HM-500 chemical anchoring
Due to the short construction period and complex construction conditions, design changes or modifications often occur during the construction process.So need post installed rebar connections using HM-500 chemical anchoring
Project overview
The building is 26 stories above ground and 3 stories underground, with an elevation of 17.30 meters and a reinforced concrete frame shear wall structure. Due to the short construction period and complex construction conditions, design changes or modifications often occur during the construction process.So need post installed rebar connections using HM-500 chemical anchoring
Strengthening materials
Steel rebars:HRB335
HM-500 injectable anchoring adhesive